About MT

Rank: Semiconductor

Learn more about ranks and badges.

MT's latest conversations

MT Semiconductor
07-12-2018

Re: Installation of net meter for new/returning customer

Hi, on 01/11/2018 I switched to AGL for electricity. I waited the 10 days and on 15/11/2018 I sent in the completed and sent the Application for Electricity form to aglnewconns@agl.com.au.On 21/11/2018 new connections (Mick (A144811)) passed the request onto to Solar Connections.On 24/11/2018 Solar Connections (Sourav (A132678)) sent a request to new connections (I think (1)) for the REC and phase number (they cc'd me I think (2)).Nothing since. 1. I think because the it was started with Hi T ...
11 Replies 1 Like
MT Semiconductor
14-09-2018

Re: Installation of net meter for new/returning customer

Jayden, that's good and thanks for the very prompt response. So can I, say if I switched today, then submit the form to apply for the smart/net meter and if so how does the last meter reading (bill issued on 29/8/2018) and the 10-day cooling off period come into play.Would I have to have request a reading? (One issue that irks me is that the current provider says I have to wait until the solar is installed before applying for a new meter).
11 Replies 1 Like
MT Semiconductor
13-09-2018

Re: Installation of net meter for new/returning customer

What if you don't have a meter(s) that are already configured? My situation is similar, in that I'm an ex AGL customer (actually still with AGL for gas) and I have 3-phase. However, as yet the Solar system hasn't been installed although the Permission to Connect has been granted, and I have never had feed-in-tariffs applied (newer had any). What if I were to change before to AGL and select a non-solar plan, would the Smart-Meter/Net meter then be installed for free as it would (as i understand) ...
11 Replies 1 Like