08-10-2018

3phase smart meter with controlled load

I have been trying for around six weeks to get a 3phase smart meter with controlled load installed. First visit tech showed up onsite and called me (left my number in the meter box) and advised me that AGL had created the wrong order. The order created was for a singe phase smart meter with controlled load. At this point he couldn't do anything to help and I had to go back to AGL. He did however advise me that the three meter needed an additional single phase meter installed to handle the contro ...