New meter installed on Friday last & showing Code 13 (exporting) so how can this be at 9 pm at night? 21.2 Kw/h. 03 is showing at the same time, 11.2Kw/h Is this due to a fa...
Solar panels installed Dec17. AGL have not provided a solution to install the required meter. Contacted AGL installation team, no result. moved to AGL complaints, no results. moved to AGL investigati...