Emergency, Faults and Outages

Sort by:
Simply follow these three steps:   Locate your switchboard and check that the hot water main switch is on. Press and hold the green coloured ‘boost’ button on the top right-hand-side of your electricity meter for at least 5 seconds. Wait one hour for the water to heat up to the optimum temperature.  
View full article